Select Design Works // Roots and Routes

Roots and Routes

Tree-Preserving Accessible Sidewalk System

Summary

An applied research design proposal for residential-scale sidewalk boardwalks set to be prototyped and tested in 2027 with funds from the Landscape Architecture Foundation awarded through National Olmsted Scholar Finalist selection.

Project Type

Project Type

Ongoing work to be constructed that began as a Master of Landscape Architecture applied research project.

Ignacio Lopez Buson

Dr. Gwynne Mhuireach


Instructors

Dr. Elizabeth "Ellee" Stapleton

Advisor and Instructor

Preparation Fall 2024 - Spring 2025

Research Fall 2025 - Winter 2026

Schematic Design Winter - Spring 2026

Design Development Ongoing

Preparation
Fall 2024 - Spring 2025

Research
Fall 2025 - Winter 2026

Schematic Design
Winter - Spring 2026

Design Development Ongoing

Timeline

Next Project

Tree-Preserving Accessible Sidewalk System

Roots and Routes

Select Design Works // Roots and Routes

Design Problem
Sidewalk Root Heave